Product Banner
Foyer > Produit > Cable Equipment > Horizontal Type Enamelled Wire Machine

Horizontal Type Enamelled Wire Machine

    Horizontal Type Enamelled Wire Machine

  • Catégorie:
    Cable Equipment
  • Constatations:
    49
  • Temps de publication:
    2025-11-07 15:07:36
  • Part:
  • Enquête


 Brand new factory direct sale high quality  4000-12+12/8Horizontal Enamelled Wire Machine

 

Product Description

 

1. Save energy and reduce cost: saves more than 50% power.

2. Increase production capacity: the production output is improved by 50%than the original model machine.

3. Protect environment: catalyze combustion and purify the harmful gases and turn waste to wealth. Then use the application of the new technology of oven and softening furnace to truly realize energy saving and cost reducing.

4. Equipment features: durable, stable, convenient, high efficient,environmental protection, no aging and cocking and zero discharge.

Machine Name   

Double Hearth Vertical Enamelled  Machine 

with Heated Air Circulation

Horizontal Enamelled Machine 

with Heated air Circulation

Horizontal Enamelled Machine

 with Heated Air Circulation

Model

7400-14+14/6

7400-12+12/7

5000-12+12/9

4500-12+12/8

4000-12+12/8

5000-6+6/12

 wire gauge

0.6mm-1.80mm

0.80mm-2.50mm

0.40mm-0.80mm

0.25mm-0.60mm

0.10mm-0.30mm

0.30mm-0.8mm

Number of wire

28(14+14)

24(12+12)

24

24

24(12+12)

12

 Number of coating tracks

6

7

9(7+2)

8

8

12

Distance between wires

12.5mm

12.5mm

8mm

7mm

6.5mm

8mm

 Range of wire speed

0-50m/min

0-40m/min

Max100m/min

Max250m/min

Max300m/min

160m/min

 Take-up spool

PT15-PT25

PT15-PT25

PT15-PT25

PT15-PT25

PT10-PT25

PT25-PT200

 Pay-off spool

400mm-500mm

400mm-500mm

 

 

 

 

 Pay-off  method

Roll

Roll

 

 

 

Wire drawing track number   Max10

 Take-up method

Single shaft horizontal take-up

 

 

 

Max drawing wire diameter 1.12mm

Coating method

Felt /Mould

 

 

 

Mould coating tracks

 Supply voltage

3×380V50HZ

3×380V50HZ

 

 

 

 

 Total power

270KW

270KW

135KW

120kw

105kw

230kw

 Daily power consumption

About 700kw.h

About 700kw.h

About 300kw.h

About 300kw.h

About 300kw.h

 

 4746__20230301145155enamelling machine (4)

 

Packaging & Shipping

 

 

  (15)
Company Information

_

 

 

SOKA (CN) Mechanical Co., LtdWas established in 2009,SOKA company is a modern enterprise with rich practical experience in manufacture and trade.Our factory has been established for more than 20 years.The machine sell well all over the world and are famous for their excellent quality.To enjoy high reputation at home and abroad,Deeply foreign cooperation buyer to soka company's favor and the trust

Customer visit

 

 

The Exhibition

120____

 

 

 

 

FAQ

01 Q:You product exported to which countries?

We exported to India,Argentina ,Uzbekistan,Tajikistan Russia,Algeria,Thailand,Egypt.,Tanzania,Qatar ,Hungary,Ghana,

Turkey,Bangladesh,Trinidad and Tobago,Lithuania

02 Q: If the client no any Production experience, How can help

the client?

A:we provide you with professional team is responsible for equipment installation and debugging
B: training your workers operate the machines,
C: Lifelong provide free technical guidance for our client  
D:according to your budget to help you design the ideal investment programs
E: make sure the client with minimum investment and the highest return

03 Q:How about the quality and the service life of the machine  ?

Concerning with every detail, every processing procedure of our products, using reliable components. Electrical appliances all adopt international famous brand (Such as Siemens, Schneider )

Running test will be carried out before delivery.

The machine at least use 8-20 years, the daily maintenance of equipment and and maintenance is very important ,

High configuration equipment use life more longer  

04 Q:How long is your machine’s guarantee time?

Whole machine one year, electrical equipment 6 months (except wearing parts) 

05 Q.How about the spare parts?

After we finish our deal, we will offer you a spare parts list for your reference.

Make sure we can long-term supply the relevant components of machines and the maintenace service. But after the free period of service, you need to pay some charge according on the actual situation such as travel expense,standard hour plan and the components cost (factory price).

 

06 Q:How many workers are needed to operate the machine?

1-4 people According to the worker's operation skill level

Contact us

Address: Shangdong Oasis 5-4-1101, Shijiazhuang, Hebei, China

Mobile: +8613931899214

Whatsapp:+8613931899214

Wechat:13931899214


Copyright © 2025 JiChun. All rights reserved.