Product Banner
الصفحة الرئيسية > المنتج > Building Materials & Hardware > Water Tank Wire Drawing Machine

Water Tank Wire Drawing Machine

    Water Tank Wire Drawing Machine

  • Category:
    Building Materials & Hardware
  • Views:
    50
  • Publish time:
    2025-11-11 11:44:37
  • Share:
  • inquiry

 

Product Description

 Summary :

 JDLT-350 type water tank steel wire drawing machine,It can drawing ferrous metal wire and some non-ferrous metal wire. It can be widely used for: galvanized wire, wire mesh, wire cable spring and other similar manufacturing industrie

 

 LT1/350 water tank steel  wire machine price factory saler 

Technique Parameter :

 

1

Dia of made tank drum:

350mm

2

Drawing pass:

8-12 die

3

Max.inletwire diameter:

2.8-3.0mm

4

Min.outletwire diameter:

1.0-1.2mm

5

Total compression rate:

Almost 87%

6

Average compression rate:

Almost 12%

7

Line speed:

5-5.5 m/S

8

Take-up way:

Made tank take-up

9

Cooling way:

Full immersion with spray

10

Main control motor:

30KW motor 50HZ

11

Machine Weight:

About 2600kg

12

Size:

2520×1150×1080mm

 

Transmission Structure:

1.The machine including Y series motor, inverter, gear box, the water box and electrical system

2. The drawing drum by the main motor to passing through the V-belt and gear box, Storage Tank of the closing line and one pair of spiral bevel gear drive to close the line.

3,Drawing roller and the die is mounted on the water tank, drawing wire cooled by showing and immersing. Equipped with a valve inlet pipe. Outlet in the tank proper way.

4. Horizontal drawing work

 

Operation Use:

 

Put semi-finished wire on the taking off device, install it into the drawing machine. Wire head rolled tip or file tip, and put in the drawing mold. Put the branch mold in the frame after pointing machine drawing some wire. Wire on the round tower around 1.5-2.5 circle. Tighten the wire with pliers and driving the motor. Pulled outafteracertainlength,thenthe above methodin ordertoputtheRoadmolduntilthefinishedmoldaroundthewireinthefinishedroll, you can startanormaldrawing. Mind the match of speed of wire collection and drawing machine.

 

 photobank (7)_ (3) (2) (4)

 

 

Our Services

 

Pre- Sales Free Training : 

 

 QQ20140910101303

 

Make sureour machineries you purchase from us can be fully used, we can train your representatives about the operation and the repair. The training items as follows:

1. the right operating mode. 2.the right maintenance way 3.trouble removing

We will guide you to install and debug the machinery when you visit our factory. But according on the

international practice, you need to pay 50 usd per person for one day.

 

After-Sales Service Contents

1.We will provide the free maintenance from the export date. 1 year for main mechanical parts and 6 months 

for electrical equipments (except wearing parts) 2.We will supply the components and technology. Make sure we can long-term supply the 

relevant components of machines and the maintentance service. But after the free period of service, 

you need to pay some charge according on the actual situation such as travel expense,standard hour plan and the components cost (factory price). 

Our AfterSales Service Commitment:

As soon as we get your machine fault information, our research personel and the maintenance

personel will analyse machine fault and make the solutions.If it need our technicist to go to your factory, we will arrive the destinated place during 24 hours for 

domestic clients and 7 working days for international clients.

Packaging & Shipping

 

3QQ20160314113532

 

Our Services

 

Pre- Sales Free Training : 

 

 QQ20140910101303

 

Make sureour machineries you purchase from us can be fully used, we can train your representatives about the operation and the repair. The training items as follows:

1. the right operating mode. 2.the right maintenance way 3.trouble removing

We will guide you to install and debug the machinery when you visit our factory. But according on the

international practice, you need to pay 50 usd per person for one day.

 

After-Sales Service Contents

1.We will provide the free maintenance from the export date. 1 year for main mechanical parts and 6 months 

for electrical equipments (except wearing parts) 2.We will supply the components and technology. Make sure we can long-term supply the 

relevant components of machines and the maintentance service. But after the free period of service, 

you need to pay some charge according on the actual situation such as travel expense,standard hour plan and the components cost (factory price). 

Our AfterSales Service Commitment:

As soon as we get your machine fault information, our research personel and the maintenance

personel will analyse machine fault and make the solutions.If it need our technicist to go to your factory, we will arrive the destinated place during 24 hours for 

domestic clients and 7 working days for international clients.

Company Information

_

 

SOKA (CN) Mechanical Co., Ltd. Was established in 2009,SOKA company is a modern enterprise with rich practical experience in manufacture and trade.Our factory has been established for more than 20 years.The machine sell well all over the world and are famous for their excellent quality.To enjoy high reputation at home and abroad,Deeply foreign cooperation buyer to soka company's favor and the trust .Also let the SOKA company product categories with the needs of the industry and continue to expand.Relying on existing factory products, we have become one of the most trusted partners of many foreign buyers in China.Now SOKA has been involved in the Building materials industry To provide one-stop, diversified services for foreign buyers.

 

Building materials industry products include:

Straight wire drawing machine, Pulley wire drawing machine,Water tank wire drawing machine,Inverted wire drawing machine, Annealing Furnace And Galvanizing Wire Production line

Fastener  high speed new type nail making machine of  wire nail and concrete nail , coil nail and roofing nail

 

Over the past decade, the SOKA service team has provided professional and customized solutions to nearly thousands of global buyers from more than 50 different countries.

Our overseas partners are from different countries

Central Asian countries: Kazakhstan, Kyrgyzstan, Tajikistan, Uzbekistan and Turkmenistan.

Asia: Vietnam, Cambodia, Indonesia.

Southeast Asia: Sri Lanka, Pakistan, India, Bangladesh, Nepal.

West Asia: Turkey, Israel, Jordan, Saudi Arabia, Oman, Qatar, Kuwait ect.

Eastern Europe: Hungary, Ukraine, Romania, Russia, Belarus.

Northern Europe: Lithuania, and southern Europe: Spain, Macedonia, Slovenia, Serbia, Albania.

Africa: Egypt, Tunisia, Algeria, Morocco, Ethiopia, Kenya, Tasmania, Uganda, Ghana, Nigeria, Zambia, Zimbabwe, Malawi, Botswana, Mauritius.

 

The Exhibition

120____

 

 

 

 

 

 

FAQ

01 Q:You product exported to which countries?

We exported to India,Argentina ,Uzbekistan,Tajikistan Russia,Algeria,Thailand,Egypt.,Tanzania,Qatar ,Hungary,Ghana,

Turkey,Bangladesh,Trinidad and Tobago,Lithuania

02 Q: If the client no any Production experience, How can help

the client?

A:we provide you with professional team is responsible for equipment installation and debugging
B: training your workers operate the machines,
C: Lifelong provide free technical guidance for our client  
D:according to your budget to help you design the ideal investment programs
E: make sure the client with minimum investment and the highest return

03 Q:How about the quality and the service life of the machine  ?

Concerning with every detail, every processing procedure of our products, using reliable components. Electrical appliances all adopt international famous brand (Such as Siemens, Schneider )

Running test will be carried out before delivery.

The machine at least use 8-20 years, the daily maintenance of equipment and and maintenance is very important ,

High configuration equipment use life more longer  

04 Q:How long is your machine’s guarantee time?

Whole machine one year, electrical equipment 6 months (except wearing parts) 

05 Q.How about the spare parts?

After we finish our deal, we will offer you a spare parts list for your reference.

Make sure we can long-term supply the relevant components of machines and the maintenace service. But after the free period of service, you need to pay some charge according on the actual situation such as travel expense,standard hour plan and the components cost (factory price).

 

06 Q:How many workers are needed to operate the machine?

1-4 people According to the worker's operation skill level.

 

Contact us

Address: Shangdong Oasis 5-4-1101, Shijiazhuang, Hebei, China

Mobile: +8613931899214

Whatsapp:+8613931899214

Wechat:13931899214


Copyright © 2025 SOKA. All rights reserved.